/Concrete Absorption
This document is a section of the
Autodromo of Terramar (Sitges). It references the time it takes for a
drop of water to be absorbed by the concrete every 50cm on the secion
during one day.
/ΔtThis document represents the difference of the absorbtion time of the concrete between two adjacent hours of the day.
Charlotte Le Dain